Ashford Castle

This project required the Refurbishment and repair of the existing timber windows, the removal of all rotten and defective timber, the Stripping down of paint, Re-painting the existing windows and leaving the windows in good working order. We also manufactured new hardwood timber windows to match existing profiles with only a 0.5mm tolerance. We were required to draw up a full report on each window stating the works required to each window.

February 16, 2017
Timeless Wood & Sash Windows of Dublin

Ashford Castle

This project required the Refurbishment and repair of the existing timber windows, the removal of all rotten and defective timber, the Stripping down of paint, Re-painting […]
February 10, 2017
Timeless Wood & Sash Windows of Dublin

Ashford Castle

This project required the Refurbishment and repair of the existing timber windows, the removal of all rotten and defective timber, the Stripping down of paint, Re-painting […]
February 10, 2017
Timeless Wood & Sash Windows of Dublin

Ashford Castle

This project required the Refurbishment and repair of the existing timber windows, the removal of all rotten and defective timber, the Stripping down of paint, Re-painting […]
February 10, 2017
Timeless Wood & Sash Windows of Dublin

Ashford Castle

This project required the Refurbishment and repair of the existing timber windows, the removal of all rotten and defective timber, the Stripping down of paint, Re-painting […]